Aller au contenu principal
← Use Cases · ENERGY / WATER / TRANSPORT (NIS2)

SCADA & Electrical substations

Edge E300GARANCE PKI
01 — Analysis

Problem

SCADA systems and electrical substations communicate over industrial protocols (IEC 61850, DNP3, Modbus) historically unencrypted. NIS2 now mandates securing them. Environmental constraints (DIN format, -40C/+70C, vibrations) exclude standard servers.

CryptOps Solution

CryptOps Edge E300 (industrial wall-mount format) transparently encrypts SCADA communications without modifying industrial protocols. IEC 62351 compatible for electrical automation encryption.

Deployment architecture

02 — Performance

Key metrics

DIN Rail
wall-mount
Format
-40/+70
C
Temperature
<1
us
Latency
IEC 62443
SL2
Target certification
03 — ROI

ROI analysis

Item Before With CryptOps Impact
Unencrypted SCADA incident (cost) 50M EUR+ (Ukraine 2016) End-to-end encryption Service continuity
NIS2 OIV compliance Sanction up to 10M EUR Compliant with Art. 21 Risk eliminated
Deployment (vs US solution) 18-24 months 6-10 weeks Sovereignty
04 — Compliance

Applicable regulation

NIS2 Art. 21
OES network security

Mandatory encryption for operators of essential services, including electrical operators.

IEC 62351
Electrical automation communication security

International standard for encrypting IEC 61850, DNP3, ICCP communications.

IEC 62443
Industrial systems cybersecurity

Security Level 2 targeted for AllEyes Resilient in industrial environments.

05 — Target clients

Target clients

Electrical grid operators Energy transmission operators Water network operators Transport operators
06 — Business applications

Data processing on the same appliance

Beyond post-quantum encryption, every AllEyes Resilient appliance hosts your data-processing workloads on its FPGA, CPU and GPU resources — all isolated from the certified crypto core.

Next step

Secure your infrastructure today

Our team will guide you through the deployment tailored to your use case.